.Before hoisting, it is necessary to read the enclosed file to understand the hoisting demand information such as the weight and size of the equipment.
.The installation of equipment shall be carried out by professional operators
.Spare parts used for hoisting equipment shall conform to national industry standards
.The installation position, hoisting method and installation direction of the equipment shall follow the drawings designed by the workshop    
.Safety measures for equipment hoisting shall conform to the industry's operating rules and specifications for aerial work    
.The fixing of bolts and nuts for equipment hoisting, the welding and hoisting of fixed supports shall conform to the corresponding industry standards   
.The lifting of equipment shall ensure that the axial fan of equipment is in a horizontal position    
.The derrick of the equipment shall be vertical to the equipment, and oblique stretching is not allowed    
.Open flames, welding or polishing sparks are not allowed to enter and around the equipment    
.No foreign matter is allowed to enter the equipment    
.The equipment should be placed in a dry location